Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Mar 14, 2022     Pitot tubing - (4 hours)       Category: Wings
Changed gears a bit today and started working on the pitot tube tubing and AOA tubing. Previous builder had already sealed up the bottom skins of the wing so working inside the wing through the access panels was a bit challenging say the least. Opened up the upper tooling hole to 3/8” to accommodate the AOA tubing. Ran into a little roadblock a the root of the wing where the ribs are to close together to get a drill inside. Had to order a 12” drill bit to finish the tube routing. Made a template to mount the heat controller to a rib for the pitot. Clamped in place for now. Controller will have to go on the outboard side of the rib to avoid the bump out of the lightening holes. Sanded down the canopy fairing again..


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.